Thumbnails

Slideshow (4 photos)

The Hut (map)
 

Bob on the roof, preparing it for the roof panels

 

A large crew is required to lift the 10" stress skin panels onto the roof

 

The crew getting started with the raising; Steve is dealing with an issue where the iron rods in the foundation are mispositioned

 

Bits of the timber frame are assembled on the ground before being raised