The Hut (map)

Bob on the roof, preparing it for the roof panels

A large crew is required to lift the 10" stress skin panels onto the roof

The crew getting started with the raising; Steve is dealing with an issue where the iron rods in the foundation are mispositioned

Bits of the timber frame are assembled on the ground before being raised