Carpenter butt
|
|
 |
Colin messing around with the giant hammer, Kevin in the background
|
|
 |
The crew prepares to receive the ridge pole
|
|
 |
The first large bents has just been moved into position
|
|
 |
Kevin holds a brace in position while a post is slid into position
|
|
 |
Kevin clamps a strongback onto a joint to provide lateral strength during lifting
|
|
 |
Raising the final bent
|
|
 |
The final bent now flies through the air
|
|
 |
The final bent is lowered into position
|
|
 |
The finished frame
|
|
 |
A closeup of the raising crew
|
|
 |
Another view of the finished frame and crew
|
|
 |
The front ridge pole is positioned in place
|
|
 |
Another view of the front ridge pole being installed
|
|
 |
All hands on deck for the second ridge pole
|
|
 |
Steve uses superhuman strength to casually move a 300 pound post; Kevin looks on in awe
|
|
 |
Steve straps and Kevin clamps -- preparing to move a section of timber frame with the crane
|
|
 |
Working during the raising
|