The Hut, Roof (map)

Bob on the roof, preparing it for the roof panels

A large crew is required to lift the 10" stress skin panels onto the roof

The roof is finally installed -- 24 guage standing seam, double lock, Hartford green

The new roof

The new roof from the northwest with cutouts for the kitchen exhaust, boiler, and septic vent

The pile of 10" stress skin for use on the roof