The panels in the peak of the roof needed to be assembled in advance, then slide up behind the post-and-beam structure using a sledge hammer

Location

The Hut, Interior (map)

The panels in the peak of the roof needed to be assembled in advance, then slide up behind the post-and-beam structure using a sledge hammer