|
|
A large crew is required to lift the 10" stress skin panels onto the roof
|
|
|
Crane at the site before the raising
|
|
|
Jim holds the temporary brace as the others lower the ridge pole into position
|
|
|
Clamping the floor section to the door section
|
|
|
Mike climbs the door section
|
|
|
Preparing a large section of the timber frame for lifting by the crane
|
|
|
The crew prepares to receive the ridge pole
|
|
|
The first large bents has just been moved into position
|
|
|
Steve and Doug preparing for the first large bent
|
|
|
Crew members prepare the floor section to be raised into position
|
|
|
A post is positioned, making sure that the brace and horizontal member are fit at the same time
|
|
|
The crew getting started with the raising; Steve is dealing with an issue where the iron rods in the foundation are mispositioned
|
|
|
Four strong backs are required to move a rafter subsection
|
|
|
Continuing to move the rafter subsection, Doug comes to help
|
|
|
Continuing to move the rafter subsection, Doug helps, Jou and Doug watch
|
|
|
The very first frame subsection raised into postion -- the king posts around the front door
|
|
|
Lunch on raising day
|
|
|
A minor ridge pole is lowers into position
|
|
|
Mike gets aggressive with the orange mallet
|
|
|
Steve and Jim move rafters around
|
|
|
A large subsection of rafters is lifted by crane and positioned around the chimney opening
|
|
|
The first ridge pole is moved into position
|
|
|
Bits of the timber frame are assembled on the ground before being raised
|
|
|
Doug coats the end grain of a post with preservative
|
|
|
Raising the final bent
|
|
|
The final bent, a little higher
|
|
|
The final bent is lowered into position
|
|
|
The finished frame
|
|
|
A closeup of the raising crew
|
|
|
Another view of the finished frame and crew
|
|
|
The front ridge pole is positioned in place
|
|
|
Another view of the front ridge pole being installed
|
|
|
All hands on deck for the second ridge pole
|
|
|
Steve cleans the debris from a mortise
|
|
|
Monir adjustments are made to a tenon to ensure a proper fit
|
|
|
Steve uses a small tractor to move timbers around his yard and shop
|
|
|
Joe and Steve prepare the rafter subsections that surround the chimney
|
|
|
Steve and Mike oversee the movement of member
|
|
|
Steve and Mike slide the roof truss together
|
|
|
Steve inspects a mortise before fitting together the mating members
|
|
|
The crane ball is moved into position by Steve
|
|
|
Steve uses superhuman strength to casually move a 300 pound post; Kevin looks on in awe
|
|
|
Steve does his thing
|
|
|
Steve positions a brace as a complicated joint comes together
|
|
|
Just before the joint comes together
|
|
|
Steve hands something up to Jim
|
|
|
Steve straps and Kevin clamps -- preparing to move a section of timber frame with the crane
|
|
|
Steve applies straps to a frame section to move with the crane
|
|
|
Working during the raising
|