Thumbnails

Slideshow (23 photos)

The Hut (map)
 

A large crew is required to lift the 10" stress skin panels onto the roof

 

Carpenter butt

 

The first large bents has just been moved into position

 

Lunch on raising day

 

A minor ridge pole is lowers into position

 

Mike gets aggressive with the orange mallet

 

A large subsection of rafters is lifted by crane and positioned around the chimney opening

 

Richard and Tom guide the rafters into position

 

The first ridge pole is moved into position

 

The first bent is moved into position

 

Raising the final bent

 

The final bent, a little higher

 

The final bent now flies through the air

 

The final bent is lowered into position

 

The finished frame

 

A closeup of the raising crew

 

Another view of the finished frame and crew

 

Richard attaches a comealong to pull sections of the frame together

 

The front ridge pole is positioned in place

 

Another view of the front ridge pole being installed

 

All hands on deck for the second ridge pole

 

Securing the second bent

 

Working during the raising