|
 |
Crane at the site before the raising
|
|
 |
Calvin prepares a mortise in the shop
|
|
 |
Calvin drills a hole for a dowel
|
|
 |
Calvin uses giant orange hammer to wack something into place
|
|
 |
Calvin working in the shop on the timbers
|
|
 |
Calvin cuts a dowel to make room for the ridge pole
|
|
 |
The crew prepares to receive the ridge pole
|
|
 |
Amstutz's shop with Jack making a phone call while Calvin works
|
|
 |
Jim tries to be helpful, but probably is getting in the way
|
|
 |
Four strong backs are required to move a rafter subsection
|
|
 |
Continuing to move the rafter subsection, Doug comes to help
|
|
 |
Continuing to move the rafter subsection, Doug helps, Jou and Doug watch
|
|
 |
Lunch on raising day
|
|
 |
Setting up the straps and comealong in order to pull together the two bents
|
|
 |
The final bent is lowered into position
|
|
 |
The finished frame
|
|
 |
A closeup of the raising crew
|
|
 |
Another view of the finished frame and crew
|
|
 |
Another view of the front ridge pole being installed
|
|
 |
All hands on deck for the second ridge pole
|
|
 |
Taking a break from the action
|