|
 |
A large crew is required to lift the 10" stress skin panels onto the roof
|
|
 |
Carpenter butt
|
|
 |
The first large bents has just been moved into position
|
|
 |
Lunch on raising day
|
|
 |
A minor ridge pole is lowers into position
|
|
 |
Mike gets aggressive with the orange mallet
|
|
 |
A large subsection of rafters is lifted by crane and positioned around the chimney opening
|
|
 |
Richard and Tom guide the rafters into position
|
|
 |
The first ridge pole is moved into position
|
|
 |
The first bent is moved into position
|
|
 |
Raising the final bent
|
|
 |
The final bent, a little higher
|
|
 |
The final bent now flies through the air
|
|
 |
The final bent is lowered into position
|
|
 |
The finished frame
|
|
 |
A closeup of the raising crew
|
|
 |
Another view of the finished frame and crew
|
|
 |
Richard attaches a comealong to pull sections of the frame together
|
|
 |
The front ridge pole is positioned in place
|
|
 |
Another view of the front ridge pole being installed
|
|
 |
All hands on deck for the second ridge pole
|
|
 |
Securing the second bent
|
|
 |
Working during the raising
|