|
![](images/web/pickme4.jpg) |
Crane at the site before the raising
|
|
![](images/web/pickme4.jpg) |
Boom of the crane during the raising
|
|
![](images/web/pickme4.jpg) |
Doug cuts a dowel to length
|
|
![](images/web/pickme4.jpg) |
The crane operator directing traffic
|
|
![](images/web/pickme4.jpg) |
Practiced hands perform the delicate work of moving timbers into place
|
|
![](images/web/pickme4.jpg) |
Practiced hands perform the delicate work of moving timbers into place
|
|
![](images/web/pickme4.jpg) |
Cutting dowels to length
|
|
![](images/web/pickme4.jpg) |
The timber frame, about 1/3 completed
|
|
![](images/web/pickme4.jpg) |
Trimming a dowel to the correct length
|
|
![](images/web/pickme4.jpg) |
The crew getting started with the raising; Steve is dealing with an issue where the iron rods in the foundation are mispositioned
|
|
![](images/web/pickme4.jpg) |
Continuing to move the rafter subsection, Doug helps, Jou and Doug watch
|
|
![](images/web/pickme4.jpg) |
Lunch on raising day
|
|
![](images/web/pickme4.jpg) |
All hands on deck for the second ridge pole
|